• Shipyard CdA in S. Nazaire/FR for spain company REGENASA
  • FEADSHIP Aalsmeer/NL , carpenters on megayacht for METRICA GmbH
  • Shipyard BSB-SCHIFFSHALLE in Friedrichshafen/DE , ship interior finishers on repaired electrical ferry for HaEff GmbH
  • Big team of interior finishers in PHILLY SHIPYARD in Phyladelp[hia/USA
  • Shipyard MEYWERWERFTCHRIS nuo 34 iki 39 sav. Schoolkoppel 16, Langeln, 25485 Deutschland
  • Shipyard MEYERWERFT , big group of interior finishers on end-works of cruise ship „Jubilee“ for IS MAKINEN.
  • Shipyard MEYER TURKU in Finland , workers for AEGROUP
Interior Finishing Oversight in Collaboration with IS MAKINEN - Key Contributions to the Culmination of Cruise Ship 'Jubilee' by Shipyard MEYERWERFT
Image 1 Image 2 Image 3 Image 4 Image 4
Shipyard CdA in St Nazaire/FR , panel installers for GANTER
Image 1 Image 2 Image 3 Image 4 Image 5
Shipyard CdA in S. Nazaire/FR for spain company REGENASA
Image 1 Image 2 Image 3 Image 4 Image 5
  • DAMEN YACHTING Vlissingen/NL , stonemasons on megayacht
  • CONTRACT nuo 1 sav. iki 9 sav. Shipyard in Saint-Nazaire, Av. Antoine Bourdelle, 44600 Saint-Nazaire
  • KOOIMAN ZWIJNDRECHT 6 carpenters and KOOIMAN DORDRECHT 2 carpenters on repaired ships.
  • TRIDENT nuo 8 iki 13 sav. Shipyard in Turku
  • VAN KRALINGEN in  Lisserbroek/NL . 12 carpenters by production of  yacht-furniture
  • RAUMA SHIPYARD , 6 carpen installers for finnish MERIMA
  • ARNIS nuo 7 iki 2023 m. 28 sav. Arnis
  • BLOHM + VOSS shipyard in Hamburg/DE , carpenters on repaired megayacht
  • Yacht interior outfitters by fiinish yacht-producer in Peitersaari/FIN
  • Wet-units prefabricated factory SANU in Waalwijk/NL , carpenters , tylers , metall workers
  • Shipyar PTW in Tarragona/ES
  • Shipyard in Egypt/Cairo , newbuild of river cruise ship
  • CANTIERE FORLI in Forli/IT , newbuild of megayachts
  • LINDENAU WERFT Kiel/DE , Winch designed Megayacht Project 795 , 10 wool and glas cloth insulation workers , 3 monthes long
  • Winch designed Megayacht Project 795 , 10 Wolle und Glastuch Isolierer , 3 Monaten lang
  • MV-WERFTEN Stralsund/DE ,  on newbuild of megayacht CRYSTAL ENDEAVOR , 6 armaflex-insulators , 2 monthes long
  • In Neubau von Megayacht CRYSTAL ENDEAVOR , 6 Armaflex-Isolierer , 2 Monaten lang
  • FEADSHI Aalsmeer/NL , legendary megayacht OLYMPIA , according „youtube“  – a gift from billioner Roman Abramovich to mr Vladimir Putin. Interior renovation works on january-march
  • Laut youtube – ein Geschenk von Multimillionaer Roman Abramovich fuer Herrn Vladimir Putin , Innenausbau-Arbeiten am Januar-Maerz
  • PALUMBO SHIPYARD in Ancona/IT , 10 electricians on newbuild of megayacht NB-430 and NB-650 , on january – march
  • 10 Elektriker bei Neubau 2 Megayachten: NB-430 und NB-650 , am Januar-Marerz
  • CdA SHIPYARD in St Nazaire/FR , panell insttallers „Celebrity BEYOND“ , february-murch Panellenmonteure , Februar-Maerz
  • Swimming Marseille > Cirsica ferry PAGLIA ORBA , 10 electricians by repair works on scrubber-switchboard , on february
  • Der schwimmende Marseille> Corsica Faehre PAGLIA ORBA , 10 Elektriker bei Reparatur von Schalldämpfer-Automatikanlage , am Februar
  • Shipyard MEYERWERFT in Papenburg/DE , 4 tilers on newbuild of cruise ship „Aida Cosma“ on january-february
  • Schiffswerft MEYERWERFT in Papenburg/DE , 4 Fliesenleger in Neubau von Kreuzfahrtschiff „Aida Cosma“ am Januar-Februar
  • Shipyard MEYER TURKU/FIN , 6 carpenters and 4 tilers on newbuild of cruise ship COSTA TOSCANA on january
  • Schiffswerft MEYER TURKU/FIN , 6 Tischler und 4 Fliesenleger in Neubau von Kreuzfahrtschiff  COSTA TOSCANA am Januar
  • Shipyard FAYARD in Munkebo/DK , 4 floor installers in ferry „Norrona“ on february
  • Schiffswerft FAYARD in Munkebo/DK
  • Newbuild of big appartment-complex in Lumijälki-street in Vantaa/FIN , 12 HVAC workers , january-february
  • Neubau von grossen Mehrfamilienhaus in Lumijälki-Strasse in Vantaa/FIN , 12 HVAC-Arbeiter , Januar-Februar
  • Reparation works in highway-tunnel in Nöykkiönkatu-4 in Espoo/FIN , 16 pipefitters and welders
  • Reparaturen-Arbeiten in Autobahn-Tunnel in Nöykkiönkatu-4 in Espoo/FIN , 16 Rohrleitungsmonteure und Schweisser
  • Newbuild of big appartment-complex in Tischbergstrasse-4 in Bad Bergzabern/DE , 10 painters and wallpaper-workers on march/february 
  • Neubau von grossen Mehrfamilienhaus in Tischbergstrasse-4 in Bad Bergzabern/DE , 10 Maler und Tapezierer
  • Renovation of resort-hotel CENTRAL PARKS in Bispingen/DE , 6 furniture assamblers , 2 monthes long
  •  Renovierung des  Resort-Hotel CENTRAL PARKS in Bispingen/DE , 6Moebelmonteure , 2 Monaten lang
  • Newbuild of appartment-complex STUDIOMUC in Kleyerstrasse in Frankfurt Main/DE , 10 furniture assamblers  , 2 monthes long
  • Neubau von Apprtment-Komplex STUDIOMUC in Kleyerstrasse in Frankufrt Main/DE , 10 Moebelmonteure , 2 Monaten lang
  • 2020 Berlin, Grünheide | TESLA factory construction
  • Shipyard FEADSHIP Aalsmeer/NL , carpenters on newbuild of megayachts N-704 , N-708 , N-709 , august – december
  • Schiffswerft FEADSHIP Aalsmeer/NL , Tischler in Neubau von Megayachten N-704 , N-708 , N-709 , August – Dezember
  • Shipyard DUTCH FALCON YACHT in Waalwijk/NL , alluminium welders , july – december
  •  Schiffswert DUTCH FALCON YACHT in Waalwijk/NL , Alluminium-Schweisser , Juli – Dezember
  • Seaport Antwerpen , container ship MONTE AZUL , tank repair  , 4 welders + 4 metall workers , on december
  • Schuffshafen Antwerpen , Container-Schiff MONTE AZUL , Tank-Reparatur , 4 Schweisser + 4 Metallarbeiter , am Dezember
  • Shipyard  „Nakilat Keppel“ in Quatar , LNG-tanker “Al Thakhira” – cargo tank repair , pipefitters and welders , on september
  • Schiffswerft „Nakilat Keppel“ in Quatar , LNG-Tanker „Al Thakhira“ – reparatur von Behaelter , Rohrleitungsmonteure und Schweisser , am September
  • Shipyard WEST SEA in Viana de Castello/PT , ventillation installers on any little fisher-ships
  •  Schiffswerft WEST SEA in Viana de Castello/PT ,  Lueftungsmonteure auf einige Fischerboote
  • Shipyard MEYERWERFT in Papenburg/DE , cruise ship „Odyssey Of The Seas“ , 12 interior finishers in crew areas + 6 tilers , on may – september
  • Schiffswerft MEYERWERFT in Papenburg/DE , Kreuzfahrtschiff „Odyssey Of The Seas“ , 12 Innenausbauer + 6 Fliesenleger , Mai – September
  • Shipyard FINCANTIERI in Genova/IT , newbuild of cruise ship „Resilient Lady“ ,  12 hull welders , june 2020 – march 2021
  • Schiffswerft FINCANTIERI in Genoa/IT , Neubau von Kreuzfahrtschiff „resilient Lady“ , 12 Rumpfschweisser , Juni 2020 – februar 2021
  • Shipyard ZAMAKONA in Zumaia/ES , newbuild of „Royal Arctic“ hulls-798/797 , 12 electricians , july – december
  • Schiffswerft ZAMAKONA in Zumaia/ES , Neubau von 2 „Royal arctic“ Schiffe Nr 798/797 , 12 Elktriker und Kabelzieher
  • Shipyard MEYER TURKU/FIN , 40 tilers , carpenters , panell installers  on cruise ship „Mardi Grass“ , on may – november
  • Schiffswerft MEYER TURKU/FIN , 40 Fliesenleger , Tischler , Panelenmonteure auf Kreuzfahrtschiff „Mardi Grass“ am Mai – November
  • Shipyard FREIRE in Vigo/ES , 24 ship interior finishers ,  july – november
  •   Schiffswerft FREIRE in Vigo/ES , 24 Schiffsinnenausbauer , Juli – November
  • CdA SHIPYARD in St Nazaire/FR , 4 painetrs on cruise ship SCARLET LADY on august – october
  • CdA Schiffswerft in St Nazaire/FR , 4 Malerin Kreuzfahrtschiff SCARLET LADY am August – Oktober
  • Newbuild of big appartment-complex in Paul – Gerhardt – Allee 24 in München , tiler and drywall-workers , 5 monthes long ,
  • Neubau von grossen Mehrfamilienhaus in Paul – Gerhardt – Allee 24 in München , Fliesenleger und Trockenbauer , 5 Monaten lang
  • Renovation works in big appartment-complex PJ Landfried ( old former Tabak-fabric in Bergheimer Str. 147 in Heidelberg/DE ),  6 electricians , on august-september
  • Reparatur des grossen Appartment-Complex PJ Landfried ( die alte Tabakfabrik in Bergheimer Str. 147 in Heidelberg/DE ),  6 Elektriker , am August-September
  • Newbuild of AMAZON-center in graben/DE , 12 electricians/cable pullers , 6 pipefitters , september – december
  • Neubau von AMAZON-Center in Graben/DE , 12 Elektriker/Kabelzieher , 6 Rohrleitungsmonteure , September – Dezember
  • Hannover-Ortskamp/DE , newbuild of 6 townhouses , 6 tilers , october – december
  • Hannover-Ortskamp/DE , Neubau von 6 Doppelhaushälften , 6 Fliesenleger , Oktober – Dezember
  • Hannover-Lathusenstrasse , newbuild of appartment-complex , 6 tilers , september – december
  • Hannover-Lathusenstrasse/DE , Neubau von Mehrfamilienhaus , 6 Fliesenleger , september – Dezember
  • Newbuild of resort hotel TERHILLS in  Dilsen-Stokkem/BE , 12 furniture assamblers , 3 monthes long
  • Neubau des Resort-Hotel TERHILLS in Dilsen-Stokkem/BE , 12 Moebelmonteure , 3 Monaten lang
  • 2019 NAVANTIA Cadiz | ES, ship Star Pride: tiling
  • 2019 COLUMBUS CRUISE CENTRE Bremerhaven DE, installation of panels in the ship’s refrigerator
  • 2019 KLEVEN Ulsteinvik | NO, ship Maersk Maker: interior works
  • 2019 COLOR LINE FERRY TERMINAL Oslo | NO, floating ship Color Fantasy: interior works
  • 2019 MEYER Turku | FI, cruise ship Costa Smeralda: tiling
  • 2019 PELLA SIETAS Hamburg | DE suspended ceiling installation
  • 2019 AMELS Vlissingen | NL, mega yacht Megona, Ilona: repair, interior finishing work
  • 2019 BLOHM & VOSS Hamburg | DE furniture upholstery work
  • 2019 NAVANTIA Cadiz | ES, cruise ship Carnival Triumph: welding works, interior finishing, furniture installation, tiling
  • 2019 ORESUND DRYDOCKS Landskrona | SE, vessel Tycho Brahe: furniture installation, interior finishing
  • 2019 MW Werften Rostock | DE pipe and duct installation work, HVAC installation, welding works
  • 2019 Construction of residential houses Klaipeda
  • 2019 Construction of residential houses Klaipeda
  • 2019 NEPTUN-WERFT Rostock | DE pipe installation, welding works, copper pipe soldering, carpet installation
  • 2019 MEYERWERFT Papenburg | DE, cruise ship Norwegian Encore Innox furniture installation, railing installation, welding, insulation, tiling
  • 2019 MEYERWERFT Papenburg | DE, cruise ship Spectrum Of The Seas Innox furniture installation and welding works, interior fitting, furniture transportation, electric cable pulling
  • 018 Meyerwerft shipyard |DE, AIDA Nova: 120 furniture installers, panel installers
  • 2018 Viking Line Schiffe Rouen, Bordeux, Avignone | FR, Portugal Porto, Vienna, Austria: insulation, finisher
  • 2018 Ibis Hotels | DE, Krefeld, Hamburg, Regensburg: drywall installers
  • 2018 VW factory Wolfsburg | DE: drywall installers
  • 2018 Natural stone Factory, Berlin | DE:stone grinding, polishing
  • 2018 Marseille | FR, mega yacht: finishing
  • 2018 Benetti shipyard, Livorno | IT: TEAK-DECK installation
  • 2018 Bremen | DE: construction of commercial buildings, stone processing
  • 2018 Assens | DK: insulation, tinning
  • 2018 MEYER TURKU shipyard | FIN: tiling specialists, metal works
  • 2018 Subway, Hamburg | DE: plytelių specialistai.
  • 2018 Stockholm shipyard | FIN, mega yacht: finishing
  • 2018 Ritz-Carlton, Berlin | DE: furniture installation
  • 2018 Hull | GBR: roofing, facade finishing
  • 2018 OCEANCO Alblasserdam | NL, mega yacht: finishing
  • 2018 Stockholm shipyard | SE: CAD design
  • 2018 Fassmer shipyard | DE, Berne: finishing
  • 2018 Construction of residential housesLT, Klaipeda
  • 2018 Construction of residential housesLT, Klaipeda
  • 2018 DAMEN shipyard | the Netherlands: finishing
  • 2018 MV-Werften Wismar | DE (half year): plastic floor installation
  • 2018 Meyerwerft, Papenburg | DE, AIDA S696: insulation
  • 2018 Blohm & Voss, Hamburg | DE, mega yacht Thunder: panel installation
  • 2018 Altona Cruise Terminal Hamburg | DE, cruise ship Artania: painting, finishing
  • 2018 Navantia Yard Cartagena | ES: finishing, deck fitting on a mega yacht
  • 2018 Orebro Yachtservice Stokhol | SE, mega -vessel: finishing
  • 2018 German dry Docks, Bremerhavenas | DE: insulation
  • 2018 Dry docking, Marsel | FR, cruise ship Aida Bella: insulation
  • 2018 Metro, Hamburg | DE: tiling
  • 2018 Bremer-fabric Muehlacker | DE: tiling
  • 2018 Ibiz Hotels, Munich, Coburg | DE: construction works, tile installation, painting
  • 2018 Welness Resort Hotel Wyk auf Foehr | DE: tile installation, stone works
  • 2018 House complex Rostock | DE: floor installation
  • 2018 Vigo Shipyard | ES, cruise ship: floor installation, furniture installation, finishing
  • 2018 La Línea de la Concepción shipyard | ES, cruise ship: renovation works
  • 2018 STX France SA shipyard | FR, cruise ship: floor installation, finishing
  • 2018 Faroe Islands: carpenters, installation of frame houses
  • 2018 Meyerwerft, Papenburg | DE, ship Norwegian Bliss: panel /furniture installation
  • 2018 Luerssen, Bremen | DE: insulation
  • 2018 Neptun Werft, Rostock | DE: panel installation, insulation
  • 2018 STX France | B34 | J34 | FR: interior finishing
  • 2017 The largest cruise shipyard in Germany | DE: suspended ceilings, carcass welding, assembly
  • 2017 Luerssen Vegesack | DE, mega yacht Sassy: Bluecher- pipe installation
  • 2017 Abeking & Rasmussen Lemwerder | DE, cruise ship WERA A514: interior finishing and furniture installation
  • 2017 De Vries shipyard Makkum | NL: yacht interior finishing
  • 2017 Damen shipyard, Vlissingen | NL, mega yacht: interior finishing in the mega yacht-385
  • 2017 Heesen Yachts Oss | NL: yacht interior finishing
  • 2017 Luerssen Bremen | DE, mega yacht Schu: work with stone
  • 2017 Center of furniture Pillip Ansbach | DE: construction work
  • 2017 Campus Tower, Campus Futura Hamburg, City Council, Luebeck | DE: insulation
  • 2017 Amazon central warehouse Hamburg | DE: work for locksmiths
  • 2017 Triton-shipyard Duisburg | DE, river cargo ships: pipe installation, welding, housing assembly
  • 2017 MeyerWerft Turku | FI: panel installation, finishing
  • 2017 Abeking & Rasmussen Lemwerder | DE, warship WERA A514: interior finishing, furniture installation
  • 2017 Holm-ship terminal, Gdansk | PL: ventilation installation, welding
  • 2017 TU Dresden Microscopie, Dresden | DE: construction work
  • 2017 City theater Bayreuth | DE: construction work, installation of panels and doors
  • 2017 De Hoop Foxhol | NL, tanker: interior finishing
  • 2017 MB-92 shipyard Barcelona | ES, mega jacht Boadicea: teak-deck installation
  • 2017 Frankfurt am Main | DE, industrial object: construction work
  • 2017 Frankfurt am Main | DE, industrial object: construction work
  • 2017 Meyerwerft, Papenburg | DE, cruise ship S712: insulation, welding Erfurt | DE, industrial object: helper, work with stone slabs
  • 2017 Meyerwerft, Papenburg | DE, cruise ship NORWEGIAN JOY: panel installation, tiling, finishing
  • 2017 Mitsubishi shipyard, Nagasaki | JP, cruise ship AIDA PERLA: tiling
  • 2017 Lerrssen, Bremen | DE, mega yacht SHU: finishing
  • 2017 Blohm & Voss, Hamburg | DE, mega yacht ALFA NERO: finishing
  • 2017 Papenburg | DE, industrial object: container conversion
  • 2017 GS Yard, Groningen | NL, tankers: finishing, panel installation, furniture installation, tiling
  • 2017 Admiral Yards Marina di Carrara | IT, mega yacht: panel installation, finishing
  • 2017 Meyer Turku, MEINSCHIFF6 | FI: tiling, panel installation, finishing
  • 2017 Meyer Turku, TALLINK | FI: tiling, panel installation, finishing
  • 2016 Offshore, residential containers | DE: welding, work for locksmiths
  • 2016 Floating cruise ship | HRV: welding, repair work
  • 2016 Oil refinery, Hannover, Hartefool | DE: piping installation
  • 2016 Sicilia, Sauthemptone | IT/GB: Muffler system repair on floating ships
  • 2016 The largest cruise shipyard in Germany | DE: suspended ceiling installation, carcass welding, assembly
  • 2016 Shipyard | NL: installation of pipelines in oil tankers
  • 2016 Shipyard | JP: Welding and installation of frames / stairs;
  • 2016 Shipyard | NO, cruise ship: Outfitting, welding on RO-RO type
  • 2016 Shipyard | FI, cruise ship: HVAC installation
  • 2016 Shipyard | FI: installation of fuel, oil, cooling and other systems, installation of equipment on a cruise ship
  • 2016 Franklin Offshore, Rotterdam | NL, ship FAIRMASTER: work for carpenter, painting, finishing, panel instalation
  • 2016 Shipyard Victor Lenac | HR, cruise ship MS BERLIN: work for carpenter, painting, tiling, welding.
  • 2016 Meyerwerft, Turku | FI, vessel TALLINK: welding, finishing, tiling
  • 2016 Lerrssen Kroeger, Schacht Audorf | DE, mega yacht: finishing, panel installation
  • 2016 Ocean Co, Alblasserdam | NL , mega yacht: finishing, panel installation
  • 2016 Industrial object | DE: works with natural stone slabs
  • 2016 FASSMER WERFT, Berne | DE, scientific ship Fugro: panel installation, finishing
  • 2016 Iceland | industrial objects: finishing, work for carpenters
  • 2016 Southampton | GB, cruise ship CARIBBEAN PRINCESS: repair, welding works, work for locksmiths
  • 2016 NAVANTIA yard Cadiz | ES, Mein Schiff 3: repair-finishing work
  • 2016 FAYARD | DK, SCANDLINE ferry: panel installation, finishing
  • 2016 Meyerwerft | DE, cruise ship GENTING DREAMS: panel installation, finishing
  • 2016 Mitsubishi Yard, Nagasaki | JP: AIDA II: insulation, tinning
  • 2016 Mitsubishi Yard, Nagasaki | JP, AIDA PRIMA: painting, tiling, panel installation
  • 2016 ABECKING & RASMUSSEN, Lemwerder yard | DE, mega yacht 6501: panel installation, finishing
  • Shipyard CdA in St Nazaire/FR , panell installers for GANTER
  • Shipyard CdA in S. Nazaire/FR for spain company REGENASA
  • FEADSHIP Aalsmeer/NL , carpenters on megayacht for METRICA GmbH
  • Shipyard BSB-SCHIFFSHALLE in Friedrichshafen/DE , ship interior finishers on repaired electrical ferry for HaEff GmbH
  • Big team of interior finishers in PHILLY SHIPYARD in Phyladelp[hia/USA
  • Shipyard MEYWERWERFTCHRIS nuo 34 iki 39 sav. Schoolkoppel 16, Langeln, 25485 Deutschland
  • Shipyard MEYERWERFT , big group of interior finishers on end-works of cruise ship „Jubilee“ for IS MAKINEN.
  • Shipyard MEYER TURKU in Finland , workers for AEGROUP